Manufacturing and Industrial, Site-Cast Tilt Up

Hexcel Corporation

Windsor, CO

In order to service the fast growing Wind Energy industry in the United States, Hexcel Corporation chose Windsor, Colorado to build its new plant. The facility, which manufactures epoxy resin prepregs, is located close to a major customer’s wind turbine blade manufacturing site.

Project Summary

In order to service the fast growing Wind Energy industry in the United States, Hexcel Corporation chose Windsor, Colorado to build its new plant. The facility, which manufactures epoxy resin prepregs, is located close to a major customer’s wind turbine blade manufacturing site.

Hexcel’s challenging manufacturing requirements resulted in an innovative use of a pre-engineered structure along with a site cast concrete exterior. The 99,248 square foot facility features the installation of multiple bridge cranes and a two story corporate grade office. The LEED inspired design includes the use of low flow fixtures, high efficiency HVAC equipment, low emitting materials throughout and enhanced controllability.

Details

Client

Great Western Development Company

Project Type

Manufacturing and Industrial, Site-Cast Tilt Up

Location

Windsor, CO

Size

99,248